19-03-2025
Kanadevia Inova announces the signing of an agreement to acquire Encyclis Ireland Operations Ltd., the company which runs and maintains the Dublin Waste to Energy Facility.
25-02-2025
Swiss green-tech company unveils robots-as-a-service for the waste to X (WtX) sector, advancing plant management through cutting-edge automation and enhancing safety, efficiency and sustainability in complex industrial environments.
25-11-2024
Kanadevia Inova has been selected by Viridor to design, build and commission a new state-of-the-art Waste-to-Enegy plant in Tilbury, East London.
07-11-2024
Kanadevia Inova has started construction of a new energy recovery Facility in Walsall, UK. When it commences operation, the highly efficient plant will divert up to 436,000 tonnes of non-recyclable household and business waste away from UK landfill sites and overseas treatment.
23-08-2024
Kanadevia Inova has completed the construction and commissioning of another new Waste-to-Energy facility in the UK ahead of schedule. This milestone in the Slough Multifuel project al-lows the Performance Acceptance Certificate to be granted, enabling the plant to be handed over to the facility’s owners, SSE plc and Copenhagen Infrastructure Partners. Now the highly efficient plant will enter full commercial operation led by Kanadevia Inova’s team.
26-07-2024
As part of the Triphönix (“Tri-Phoenix”) project, three historic Steinmüller boiler units in the southern German district of Schwandorf are being replaced by two high-performance modern lines. The special-purpose association responsible for waste management in Schwandorf is entrusting the work to a longstanding partner.
29-03-2024
A consortium led by Marubeni Corporation, which includes Kanadevia Inova and the Japan Overseas Infrastructure Investment Corporation for Transport & Urban Development, has been selected to design, build and operate a new ultra-large Waste to Energy facility on behalf of the Emirates Water & Electricity Company and Tadweer Group.
19-03-2024
Kanadevia Inova has signed a significant agreement with enfinium to design and build the UK’s first small-scale waste-to-energy carbon capture pilot plant. The groundbreaking new fa-cility will be built at the existing Ferrybridge 1 facility located in West Yorkshire, England.
20-02-2024
Kanadevia Inova Steinmüller has been awarded a contract to build a new grate and boiler system at the Darmstadt waste-to-energy plant owned by Zweckverband Abfallverwertung Südhessen in Germany.
13-02-2024
Kanadevia Inova si è aggiudicata l'appalto per la progettazione e l'installazione della sua tec-nologia di incenerimento a griglia, "Inova Grate", presso il termovalorizzatore di Padova del Gruppo Hera in Italia.