Service, Plant Performance Upgrades
district heat, electricity
Increasing Thermal Output Boosts Plant Performance by 22%
The Klemetsrud Line 3 WtE boiler was commissioned in 2011 with a nominal steam flow of 78.1 t/h. Since then Kanadevia Inova has increased the incineration capacity and energy output in several steps, each comprising a variety of different measures designed to increase the plant’s performance. After each step, the operation of the plant has been evaluated at the new nominal load, and a programme drawn up for the next step. This includes a thorough cost-benefit analysis. Now the boiler is operated at a steam flow of up to 110 t/h.
The first increase in steam flow – up 4% to 81.5 t/h – was achieved in 2015 by optimising the combustion control system.
- In 2016 the flow was increased to 90 t/h by installing additional condenser systems and direct heat extraction from the economisers, as well as improving the attemperators.
- In 2017 Kanadevia Inova installed an enhanced combustion control system to boost team flow for a third time, to 95 t/h.
- Performance was boosted once again in 2019, to 110 t/h, by installing Inconel cladded boiler walls and optimised cleaning systems preventing boiler foulage.
- Analysis and feasibility study
- Performance increase programmes and engineering
- Optimisation and installation works
- Adjustments to combustion control system
- Test runs