The Greatmoore WtE plant thermally treats 300,000 tonnes of municipal waste a year – all in a single line. This guarantees a high level of availability, which is crucially important to the waste treatment process. With net efficiency of more than 25%, the plant generates 27.7 MW of electricity, enough to supply around 36,000 homes.
- Type of system: air-cooled Kanadevia Inova reciprocating grate
- Fuel: municipal and industrial waste
- Calorific value: 9.8 MJ/kg
- Number of lines: one
- Boiler design: five-pass boiler
- Flue gas treatment: SNCR, Kanadevia Inova SemiDry system
Commencement of Operation
Components Supplied by Kanadevia Inova
- general contractor for the entire plant, including construction work