Istanbul Waste Power Plant, TR

Waste to X
Engineering & Construction
Operations
Customer:
Istanbul Metropolitan Municipality (IMM)
Completion:
2021

About the Project

Turkey’s first WtX plant is (at the time of completion) the largest in Europe. Located right next to Istanbul Airport, the plant, which commenced operations in 2021, has three lines thermally treating 15% of the solid municipal waste to generate 77 MWel of electricity for the 16 million residents. Construction of the plant created value in the region, with more than a fifth of all components manufactured by local companies and the construction itself relying 100% on local workers.

Solution

Turkey’s first municipal solid waste WtX plant

Facts:

  • Equipped with an air-cooled Kanadevia Inova reciprocating grate

  • Fuel: municipal solid waste

  • Number of lines: three

  • Boiler design: five-pass boiler

  • Flue gas treatment: dry sorption with hydrated lime and activated carbon, SNCR

Interested in discussing a project?

Let's talk

Contact Form

Send message
Explore more

Related projects